Concrete mixing station consists of mixing console, material weighing system, material handling systems, material storage and control systems and other five major systems and other ancillary facilities components. Here under
the concrete mixing station
batching selection principles:
1. Select the concrete mixing
station in aggregate
batching system
Since the material is affected auxiliary equipment and space on the silo, hopper volume shall be optional larger. For mixing plant single silo volume is generally greater than 20m3, the use of a material on the belt or concrete warehouses but also then a large number, in order to reduce the footprint of stockyard. For mixing plant single silo volume is generally greater than 50m3.
2.concrete mixing station metering systems Selection Considerations
Weight measurement methods currently used, two forms of measurement and independent metering accumulation. Simple accumulation metering structure, easy maintenance, low loading height, but can not be controlled separately measurement accuracy. Individually controlled independent measurement accuracy, more complex structure, feeding height increases, the cost has increased.
3.concrete mixing station generally fully enclosed, equipped with centralized dust removal device in cold areas should be considered cold winter construction requirements, do exterior insulation. Open and easy mixing station mixing station, due to poor environmental performance, currently the new concrete mixing equipment has been rarely seen in some areas has been prohibited.
Since the material is affected auxiliary equipment and space on the silo, hopper volume shall be optional larger. For mixing plant single silo volume is generally greater than 20m3, the use of a material on the belt or concrete warehouses but also then a large number, in order to reduce the footprint of stockyard. For mixing plant single silo volume is generally greater than 50m3.
2.concrete mixing station metering systems Selection Considerations
Weight measurement methods currently used, two forms of measurement and independent metering accumulation. Simple accumulation metering structure, easy maintenance, low loading height, but can not be controlled separately measurement accuracy. Individually controlled independent measurement accuracy, more complex structure, feeding height increases, the cost has increased.
3.concrete mixing station generally fully enclosed, equipped with centralized dust removal device in cold areas should be considered cold winter construction requirements, do exterior insulation. Open and easy mixing station mixing station, due to poor environmental performance, currently the new concrete mixing equipment has been rarely seen in some areas has been prohibited.