Commercial concrete mixing station is a sales of concrete base,
and built a large mixing station more, and removal is very few, and concrete
stirring station is mainly self-sufficient, so a project after the end, the
relocation of another project, for concrete mixing station, one of various
machinery and equipment disassembly is also essential, exactly how to split it,
we specific analysis.
First,
demolition of commercial concrete stirring station before, need to put all the
power, control the power down, power off ends later to clean the material
residual mixer, batching machine, screw conveyor and cement warehouse, and
other equipment, washing after the various pipeline equipment in order, next to
the power source, the control power and all the control wires are removed.
After all the work is completed, the inspection and cleaning of the
construction site, the removal of the tools and all the security tools must be
done to improve the inspection, see there is no place to forget.
Concrete mixing station and station are more dangerous, so be sure to be conducted under
the guidance of professional, so as to ensure that the equipment is complete
without missing, without affecting the start of the next project.