Concrete mixing station on the role of air compressor



     Usually concrete mixing station must be equipped with air compressor is , what concrete mixing station on the air compressor is the role of it?
     Pressure compressor provides air , this part of the air used to open the valve cement , fly ash and other tanks , open mixing console discharge doors. Simply provide power . In addition , there are some mixing console discharge door instead of using the air but the hydraulic open. Use air has several advantages: 1 , raw materials, unlike the hydraulic system needs to replace the hydraulic oil ; 2 , easy maintenance ; 3 , compared with hydraulic quick action .

Friday, August 28, 2015

Standard set of concrete mixing station equipment is made up of what



Concrete mixing station consists of material feed storage systems, material weighing system, material handling system, mixing system, powder storage systems, powder conveying systems, powder metering systems, water and additive metering systems and control systems and other five major systems and other ancillary facilities components.
Mixer stirring their way into forced mixing and self-loading mixing. Compulsory mixer is mixing station at home and abroad mainstream use, it can be stirred liquidity, semi-rigid and rigid and other dry concrete. Since the fall mixing console main stirring fluidity concrete, rarely used in the mixing station.
Compulsory mixer according to the spindle structure is divided into a planetary mixer, single horizontal shaft mixer and twin-shaft mixer. The integrated use of performance especially in the twin-shaft compulsory mixer is best.
Material weighing system is affecting the quality of concrete mixing station concrete and concrete production cost of key components, mainly divided into aggregate weighing, weighing powder and liquid weighing three parts. Under normal circumstances, 20 cubic meters per hour or less mixing station superposition weighing methods, namely aggregates (sand, stone) with a scale, a scale with cement and fly ash, water and liquid additive were weighed and then put into the water, said liquid additive pre-mixed infighting. In more than 50 cubic meters per hour, mixing station, said the use of various materials weighing independent manner, all have adopted electronic weighing scales and computer control. Aggregate weighing accuracy of ± 2%, cement, powder, water and admixtures weighing accuracy reached ± 1%.

Wednesday, July 29, 2015

JS twin shaft compulsory concrete mixer

  Composition according to user needs as the host medium-sized mixing station (House). You can mix dry hard, plastic, mobility, lightweight aggregate concrete and all kinds of mortar, a higher cost for the users of all ages. There for all types of large, medium and small precast plant and highways, bridges, water conservancy, port and other large industrial and civil engineering.
  JS-axis compulsory concrete mixer classification: JS500, JS750, JS1000, JS1500, JS2000
25 mixing station mixing station host is JS500,35 host material capacity of 750L, theoretical production rate of 35m3 / h, duty cycle time 60s, to the whole amount of water has a convenient control, strong power, power consumption is small, strong power built prevented vortex mixer knot material advantages solidarity warehouse.
   Said one mixing station master, and more for 50 mixing station, mixing station in one of 60 concrete mixer with a high degree of automation, high efficiency, low energy consumption, low noise, easy operation, discharge speed, lining and leaves a long service life, and easy maintenance.
   75 to be used in mixing stations, 90 mixing station hosts built a vortex mixer prevents the material knot solidarity has stirred strong positions, etc., good quality mixing of concrete, but also has low energy consumption, unloading fast, easy operation , easy maintenance.
   Said the two sides mixing console, the twin-shaft compulsory concrete mixer, concrete mixing station 120 is mainly used as the host, the machine uses a motor discharge, with supporting the use of dump trucks, it is the ideal equipment of various construction sites.
   Said the tripartite mixer, mixing station to provide support for a host, for all kinds of large, medium and small precast plant and highways, bridges, water conservancy, port and other industrial and civil engineering, can mix dry concrete, plastic concrete, fluidity concrete, lightweight aggregate concrete and all kinds of mortar, is a high-efficiency model, is widely used.

Tuesday, July 28, 2015

Selection concrete mixing station batching metering

Concrete mixing station consists of mixing console, material weighing system, material handling systems, material storage and control systems and other five major systems and other ancillary facilities components. Here under the concrete mixing station batching selection principles:
1. Select the concrete mixing station in aggregate batching system
    Since the material is affected auxiliary equipment and space on the silo, hopper volume shall be optional larger. For mixing plant single silo volume is generally greater than 20m3, the use of a material on the belt or concrete warehouses but also then a large number, in order to reduce the footprint of stockyard. For mixing plant single silo volume is generally greater than 50m3.
    2.concrete mixing station metering systems Selection Considerations
    Weight measurement methods currently used, two forms of measurement and independent metering accumulation. Simple accumulation metering structure, easy maintenance, low loading height, but can not be controlled separately measurement accuracy. Individually controlled independent measurement accuracy, more complex structure, feeding height increases, the cost has increased.
    3.concrete mixing station generally fully enclosed, equipped with centralized dust removal device in cold areas should be considered cold winter construction requirements, do exterior insulation. Open and easy mixing station mixing station, due to poor environmental performance, currently the new concrete mixing equipment has been rarely seen in some areas has been prohibited.

Wednesday, July 22, 2015

Concrete mixing station stop stirring shaft causes and solutions

Concrete mixing station production line component parts of the agitator shaft is one of its components, stirring shaft raw material cement, gravel aggregate and water mixed concrete mixing plant and concrete mix into mixing for the mechanical parts in the whole production parts are parts plays an important scale. Various mechanical parts used in the past is inevitably fail. Failure agitator shaft is stopped appearing, abnormal sound, reducer temperature, noise, shaft leakage of plasma phenomena.
   Concrete mixing station stop stirring shaft is stopped or rotating agitator shaft slow phenomenon that causes that work equipment agitator shaft overload, overload of work equipment agitator shaft will cause mixing station of the agitator shaft setting does not slow - rotation.
Solving measures is to adjust the feed rate of the materials for it more than clear, but also the need to reduce the agitator shaft load, so that the normal operation of the concrete mixing station agitator shaft, you need to pair stirring blade cleaning equipment, if a foreign body is issued before the device will cause the agitator shaft stop shrill voice, the solution is to stop measures to check and remove foreign objects. More about the concrete mixing station of information, welcome your advice! Mainly by: mixing equipment, mixing transmission, feeding, unloading systems, water systems, electrical control system, consisting of a smooth system layout is relatively new compact domestic concrete mixer, the whole structure, beautiful appearance.

Thursday, July 9, 2015

Cleaning method for concrete mixing station



    With the continuous development of social construction, the demand for concrete mixing station has continuously increased in these two - class cities and other cities lower. In order to provide a more thorough service, Unique adhere to the "customer first, product quality first" belief. In this article, the influence of the service life of the concrete mixing station will be introduced for the customer to choose from.

    The hopper and piping system need to be carried out after careful cleaning. Attached to the wall of a concrete cylinder, the formation of the solidified concrete will directly affect the sealing surface of the piston which is running again, which will result in the partial fragmentation of the piston. Are different from normal wear and tear of cement mixing plant, sealing surface is not automatic pressure compensation, which will cause leakage, suction double horizontal shaft forced mixer pump weak ability to plug the rotary drum concrete mixer etc.. Based on the above analysis, it is obvious to find that there is a close relationship between the clean condition and performance of concrete mixing station.

    There are many concrete mixing plant in Henan, so the production technology of concrete mixing station is more mature in this field. This is a wise choice, from Henan's choice of concrete mixing station suppliers. Unique has excellent sales of concrete batching plant, we have reliable service. Welcome customers all over the world.

Effects of high temperature on the concrete mixing equipment



       In the hot summer, concrete batching plant will be used to get a "hot". In this case, the ready mixed concrete plant sale, operators should stop to have a check on concrete mixing station. Because the abnormal situation is production and damage, and even damage to the batching plant. Therefore, the concrete mixer sales, we should pay attention to the concrete mixing station operation in the summer is what?

      The specific batch and the internal temperature of the mixing station is not conducive to the device. For example, the bearing temperature rise of the mobile concrete plant to sell, the lubrication function will be reduced, the mixing drum will produce a certain thermal stress caused by the lining plate and screw.

     Operators should pay attention to the changes in temperature. In the production process of concrete mixing station, the heat will be produced, which will affect the mixture. Therefore, operators should pay more attention to this situation.

     In the mixing process, most of the mechanical energy is converted into heat, which will lead to the high temperature of the concrete mixing station. In order to avoid this situation, we should first do is to control the temperature of the material, preferably not more than 50.
In addition to the concrete mixing station, Unique also produces concrete mixer, concrete block molding machine and concrete pump. Welcome customers all over the world to contact us. We will provide you with quality products and excellent service.


Wednesday, July 8, 2015

Concrete mixing station right demolition process



    Commercial concrete mixing station is a sales of concrete base, and built a large mixing station more, and removal is very few, and concrete stirring station is mainly self-sufficient, so a project after the end, the relocation of another project, for concrete mixing station, one of various machinery and equipment disassembly is also essential, exactly how to split it, we specific analysis.

    First, demolition of commercial concrete stirring station before, need to put all the power, control the power down, power off ends later to clean the material residual mixer, batching machine, screw conveyor and cement warehouse, and other equipment, washing after the various pipeline equipment in order, next to the power source, the control power and all the control wires are removed. After all the work is completed, the inspection and cleaning of the construction site, the removal of the tools and all the security tools must be done to improve the inspection, see there is no place to forget.