Fine Stone Concrete Pump commodity is
currently a very common commodity concrete transportation equipment, mainly for
construction characteristics and developed warm . Since warm engineering
filling layer or mortar filling layer can be a large area , high-efficiency
construction , so the majority of the construction unit of the pro-Lai. So how
fine stone after commodity concrete pump construction inspections?
1, first purged with compressed air or high
pressure washing, after washing if not carried out within two days pumping
operations can be progressively dismantled tube , then water inside and outside
the tube , clamps and seals and other clean .
2 , after the delivery is completed
comprehensive inspection of all fittings once , then according to
specifications and soundness are to be stored properly .
3, the hopper , valve boxes , concrete
tanks and pumps to wash the outside , to ensure clean.
4 , dry cover and water , check the
electrical box electrical box on the presence or absence of water, and be
treated accordingly .
5 , cut off the power , remove the cable ,
remote control lines, while checking the various components , to see whether
the damage.
6 , deal with problems found during
operation , while the use of a random tool to clean up and maintenance , and
then with a fine stone goods Concrete pump thatch be shielded .