How fine aggregate concrete pump inspection after construction ?



   Fine Stone Concrete Pump commodity is currently a very common commodity concrete transportation equipment, mainly for construction characteristics and developed warm . Since warm engineering filling layer or mortar filling layer can be a large area , high-efficiency construction , so the majority of the construction unit of the pro-Lai. So how fine stone after commodity concrete pump construction inspections?
1, first purged with compressed air or high pressure washing, after washing if not carried out within two days pumping operations can be progressively dismantled tube , then water inside and outside the tube , clamps and seals and other clean .
2 , after the delivery is completed comprehensive inspection of all fittings once , then according to specifications and soundness are to be stored properly .
3, the hopper , valve boxes , concrete tanks and pumps to wash the outside , to ensure clean.
4 , dry cover and water , check the electrical box electrical box on the presence or absence of water, and be treated accordingly .
5 , cut off the power , remove the cable , remote control lines, while checking the various components , to see whether the damage.
6 , deal with problems found during operation , while the use of a random tool to clean up and maintenance , and then with a fine stone goods Concrete pump thatch be shielded .