Concrete twin-shaft mixer is
mainly used for mixing of various powder materials. We can produce all kinds of
powder mixing materials. Its aggregate may be wet fly ash, calcium carbide
sludge, gypsum, gravel, slag and so on. It is mainly used in the past of
supporting host a variety of standard bricks, sand-lime brick production line,
one of the important equipment is autoclaved fly ash bricks, sand-lime brick
production process of. Now a major project in the concrete mixing station also
put it as supporting the host.
Structure Features
Concrete twin-shaft compulsory mixer is mainly composed of chassis, screw shaft assembly, drives, piping, cover, chain cover and other components.
Concrete twin-shaft compulsory mixer is mainly composed of chassis, screw shaft assembly, drives, piping, cover, chain cover and other components.
1
Check before use
Transmission to press the switch, and then close the knife, to check whether the operation is flexible. Vibrators, roller operation, dial feed stick is functioning properly. Rope is wound on the reel; lift the refuse station, etc. are normal. If found fault, notify electromechanical team process. After the deal, before use.
2
Once the material can not be too much, according to the ratio of materials, pay attention to water-cement ratio. Stir once mixing time of not less than one minute, normal marinated concrete, it should be very thick porridge-like.
3
Fixed hand boot, drivers should be familiar with the role of the principle of each operating system, found fault immediately stop inspection.
Check before use
Transmission to press the switch, and then close the knife, to check whether the operation is flexible. Vibrators, roller operation, dial feed stick is functioning properly. Rope is wound on the reel; lift the refuse station, etc. are normal. If found fault, notify electromechanical team process. After the deal, before use.
2
Once the material can not be too much, according to the ratio of materials, pay attention to water-cement ratio. Stir once mixing time of not less than one minute, normal marinated concrete, it should be very thick porridge-like.
3
Fixed hand boot, drivers should be familiar with the role of the principle of each operating system, found fault immediately stop inspection.
4
Most appliances should love, cables to protect against damage.
5
Mixers should level up, people can not stand under the hopper mixer, to prevent the next funnel trounced wounding.
6
Temporary stop rail, it should regularly (every twenty minutes), start the mixer, to prevent solidification of concrete or concrete poured into the drum, drum rinse.
7
After filling Tongjiao End stop, should be promptly mortar and machine outer drum water rinse clean. Next class clean up once the feed hopper to feed a predetermined position when material falls political decentralization, and coated with a layer of oil on the outside until the next use.
Most appliances should love, cables to protect against damage.
5
Mixers should level up, people can not stand under the hopper mixer, to prevent the next funnel trounced wounding.
6
Temporary stop rail, it should regularly (every twenty minutes), start the mixer, to prevent solidification of concrete or concrete poured into the drum, drum rinse.
7
After filling Tongjiao End stop, should be promptly mortar and machine outer drum water rinse clean. Next class clean up once the feed hopper to feed a predetermined position when material falls political decentralization, and coated with a layer of oil on the outside until the next use.
No comments:
Post a Comment