Heavy tower machine



       Heavy tower machine is intermittent operation of the machine, with a short and duplication features. When work stopped when the institutions open , sometimes forward , sometimes reversed. Some cranes work day and night in three shifts , some only work group , or even a day's work only a few times. Such working conditions show : namely the use of different grades of different heavy tower crane tower crane and heavy-duty work in different organizations busy . While the role of the tower crane on the heavy load is variable , and some heavy-duty crane is often fully loaded , some regular light load , the load situation is very different , that is very different from the heavy tower crane load status differences. The use of different grades and different load conditions to determine the levels of heavy tower crane work . This work characteristics of heavy tower crane , tower crane in the design of heavy parts, metal structures and power to determine when the crane power must be considered.

    Based on the heavy tower crane working-level designers to divide both the design should also be user purchasing and leasing of heavy tower crane reference. Working-level heavy tower crane tower crane and heavy costs closely . When the purchase and leasing of heavy tower crane , tower crane to know , such as the use of heavy construction , installation , use of time and traffic, etc. , can be selected for the job required heavy-duty crane and cheap .

Cleaning method for concrete mixing station



    With the continuous development of social construction, the demand for concrete mixing station has continuously increased in these two - class cities and other cities lower. In order to provide a more thorough service, Unique adhere to the "customer first, product quality first" belief. In this article, the influence of the service life of the concrete mixing station will be introduced for the customer to choose from.

    The hopper and piping system need to be carried out after careful cleaning. Attached to the wall of a concrete cylinder, the formation of the solidified concrete will directly affect the sealing surface of the piston which is running again, which will result in the partial fragmentation of the piston. Are different from normal wear and tear of cement mixing plant, sealing surface is not automatic pressure compensation, which will cause leakage, suction double horizontal shaft forced mixer pump weak ability to plug the rotary drum concrete mixer etc.. Based on the above analysis, it is obvious to find that there is a close relationship between the clean condition and performance of concrete mixing station.

    There are many concrete mixing plant in Henan, so the production technology of concrete mixing station is more mature in this field. This is a wise choice, from Henan's choice of concrete mixing station suppliers. Unique has excellent sales of concrete batching plant, we have reliable service. Welcome customers all over the world.

Diesel Concrete mixing pump's function



    The concrete mixer pump is a new product of Unique. The hydraulic system and the pump of the diesel concrete mixer adopts imported high pressure and large displacement variable displacement pump. Diesel concrete mixer pump has been widely used in urban construction concrete mixing machinery, highway, bridge, water conservancy and other construction sites with its excellent performance. In this article the portable mixed concrete mixer concrete factory. Unique owners will explain the characteristics of the concrete mixing truck users.

Characteristics of the concrete mixer pump of diesel engine:
1. powerful power system: the main power supply customization.
2. stable and reliable hydraulic system: open hydraulic system, hydraulic buffer technology, so that the system to reverse the impact of small, less heat.
3.high performance and excellent welded seamless steel pipe used in the hydraulic line to ensure no leakage.
4.excellent electrical control system: human nature, intelligent electronic control system, make the operation more convenient.

Effects of high temperature on the concrete mixing equipment



       In the hot summer, concrete batching plant will be used to get a "hot". In this case, the ready mixed concrete plant sale, operators should stop to have a check on concrete mixing station. Because the abnormal situation is production and damage, and even damage to the batching plant. Therefore, the concrete mixer sales, we should pay attention to the concrete mixing station operation in the summer is what?

      The specific batch and the internal temperature of the mixing station is not conducive to the device. For example, the bearing temperature rise of the mobile concrete plant to sell, the lubrication function will be reduced, the mixing drum will produce a certain thermal stress caused by the lining plate and screw.

     Operators should pay attention to the changes in temperature. In the production process of concrete mixing station, the heat will be produced, which will affect the mixture. Therefore, operators should pay more attention to this situation.

     In the mixing process, most of the mechanical energy is converted into heat, which will lead to the high temperature of the concrete mixing station. In order to avoid this situation, we should first do is to control the temperature of the material, preferably not more than 50.
In addition to the concrete mixing station, Unique also produces concrete mixer, concrete block molding machine and concrete pump. Welcome customers all over the world to contact us. We will provide you with quality products and excellent service.


Do Well After Sale Service of Block Making Machine



    The after-sales service of block makingmachine is the part work of each supplier, therefore, every supplier should pay attention to its implementation.

    The working staff of review team should record the actual application status of the block machine in detail when they visit every customer’s place. Besides, the review team should give the detailed feedback to sales department and help them to make comprehensive arrangements.

    When the review team members have the failures can not be solved, they should contact company immediately. Then, the company staff should arrive customer’s place at the top speed and serve them for free. As a main promise, this principle should be taken with greatest efforts to eliminate customers’ worries in the future long term using process.
Every member of the review team should focus on working completely, especially supervising the implementation condition of our company’ after-sales service. Reliable after-sales service can ensure the normal operation of company business and regular production of customer.

    The after-sales personnel is not allowed to have any special request and should adopt to the local living standards. Do not delay your work because of living style or habit inadaptation. Be patient enough with the questions customers raise, especially essential operation points and component adjusting skills. Take the memo for reference if it is necessary.