1, focus on examination of the job before the project shall meet the following requirements:
   1) the structure of the various parts without deformation, no loose bolts;
   2) rack and pinion, guide wheels are engaged with the guide rail is normal;
   3) fixed rope ministries good, no abnormal wear and tear;
   4) within the operating range of accessibility.
2, before the start, you should check that the cable, the ground wire is intact, the control switch in the zero position.
3, the operator should operate in accordance with the command signal. Song before the job should indicate. Before the lift is not cut off the power switch, the operator shall not leave the operating positions.
4, when the elevator is running an abnormality is detected, immediately stop and take effective measures cage down to the bottom of the ladder, can continue to run after troubleshooting
5 lifts heavy rain, fog, high winds and more than six and rack rails, cables and other frozen, must be stopped and dropped to the bottom of the ladder cage, cut off the power.
6 lifts run to the uppermost or lowermost layer, the non-use as a travel limit switch stops operation control switch.
7, when the elevator is running due to a power failure or other reasons stopped halfway, you can manually decline, the motor end of the brake release solenoid manually pull out the handle slowly, slowly decline line of the ladder cage. When the ladder cage fell, shall not exceed the rated speed, manual drop must be manipulated by qualified service personnel.
After the operation, it should be dropped to the bottom of the ladder cage, each of the control switch to the zero position, cut off the power lock switch boxes, locking ladder and envelope kennel door.

Thursday, July 9, 2015

The working principle and application of building hoist




      Hydraulic building hoist platform products in accordance with the work divided into Boom hydraulic building hoist, hydraulic building hoist, Mast pole hydraulic building hoist, hydraulic building hoist arm . Hydraulic hoists are folding arm lifts ( lifting platform ) , scissor hoists ( lifting platform ) replacement. It can be widely used in railway stations, docks , airports, hotels , telecommunications, municipal gardens , grain storage, cleaning companies, public building facade decoration, decoration or power system installation and maintenance and so on . The elevator has a light weight , self-propelled , electric start , self- leg , simple operation, large work surface , especially aerial work to cross barriers and so on.

      Hydraulic hoists are widely used in automobiles, containers, mold manufacturing, wood processing, chemical filling and other industrial enterprises and production lines , to meet the different needs of working height of lift , but can be equipped with various types of table form ( such as ball , roller , wheel , turning , tilting , telescopic ) , with a variety of control ( sub -action, interaction , explosion-proof ) , with a lifting smooth and accurate , frequent start , carrying capacity and other characteristics, an effective solution to various types of industrial enterprises in difficulty lifting operation , so that the production job easier.

     Hydraulic hoist platform is drive by hydraulic fluid pressure in order to achieve the lifting of the function , its scissor mechanical structure, so there is lift lifting high stability , large platform and a higher carrying capacity, making high-altitude operations range larger , and for many people simultaneously . It enables high-altitude operations more efficient , safer and more secure.

Wednesday, July 8, 2015

The operation of the building hoist without careful maintenance



Building hoist  in the process of buildings, roads, bridges and other construction and provide material to carry a device, which can effectively accelerate the construction progress, save engineering time, reducing expenses and more economical.

The use of any machinery are inseparable from the proper maintenance, building hoist is the same, correct operation and careful maintenance is to ensure construction lifting and work performance and prolong its service life based.

Correct operation and careful maintenance, these two are complementary to each other, play a complementary role. First, correct operation can be as much as possible to reduce the tower crane maintenance times. Secondly, careful maintenance is in order to better ensure the hoist operation performance.


Tuesday, July 7, 2015

Operating rules for construction lifts and material hoist



一.             Pre operation examination items should be in accordance with the following requirements
A.      All parts of the structure without deformation, connecting bolts loose;
B.      The rack and pinion, the guide wheel and the wheel / rail joint are normal;
C.      All the wire ropes are fixed, no abnormal wear;
D.      No obstacles in operation;
二.             Before starting, check and make sure that the cable is in the zero position. After power is turned on, should check and confirm the voltage is normal, should test no leakage phenomenon. Should test and confirm the limiting device, cage ladder, enclosure door, etc. the interlock device is good and reliable, electric appliances, instruments and meters, sensitive and effective, after the start should be no-load lifting test, determination of the transmission brake efficiency, confirm normal rear can start work.
三.             The operator should according to the command signal operation, before operation of. Before the lift off the power switch, the operator may not leave the operation.
四.             When the building hoist is found to have abnormal conditions, should immediately stop and take effective measures to lower the ladder cage to the end, to remove the fault can continue to run. When the electrical control is found in the operation, press the emergency stop button immediately.
五.             Lift in heavy rain, fog, six and above the wind and rail, cable and other ice, we must stop running, and the ladder cage down to the end, cut off power. After the storm, the safety device of the elevator should be checked, and the group can run.
六.             When the lift is running to the upper or lower level, it is forbidden to use the travel limit switch as the control switch to stop running.
七.             When the lift in operation due to the power or other reasons and stop, down by hand, the motor is arranged at the tail end of the braking electromagnet manual release handle slowly out, the ladder cage slowly downward slide. When the ladder is in decline, it is not allowed to exceed the rated operating speed, and manual drop must be operated by professional maintenance personnel.
八.             After the operation, the ladder should be reduced to the end of the floor, the control switch to zero, cut off power, the lock good switch box, closed ladder cage door and door.