Heavy tower crane machine is intermittent
operation of the machine, with a short and duplication features. When work
stopped when the institutions open , sometimes forward , sometimes reversed.
Some cranes work day and night in three shifts , some only work group , or even
a day's work only a few times. Such working conditions : work Heavy tower crane
and its institutions and how busy that is, the different grades of different heavy
use of the tower crane . While the role of the tower crane on the heavy load is
variable , and some heavy-duty crane is often fully loaded , some regular light
load , the load situation is very different , that is very different from the
heavy tower crane load status differences.
The use of different grades and different
load conditions to determine the levels of heavy tower crane work . This work
characteristics of heavy tower crane , tower crane in the design of heavy
parts, metal structures and power to determine when the crane power must be considered.
Based on the heavy tower crane working-level designers to divide both the
design should also be user purchasing and leasing of heavy tower crane
reference.
Working-level the heavy tower crane and
heavy costs closely . When the purchase and leasing of heavy tower crane , should
to know the tower crane’s using, such as heavy construction , installation ,
use of time and traffic, etc. , can be selected for the job required heavy-duty
crane and cheap .
No comments: